top of page

Healthcare

Elenfield have been specialising in healthcare construction projects for over 30 years and have built up a reputation of one of the most competent healthcare construction companies operating in Ireland. The nature and size of the projects undertaken consistently calls for works to be carried out in and around live hospital services calling for due care and noise and dust control measures. With this, our staff are highly skilled and qualified to carry out such works with minimal disruption to the surrounding hospital environment. 

Some of our healthcare projects include:

- .Hemodialysis Unit, The Mater Hospital.

- Tallaght Hospital – Refurbishment of Anti Ligature services

.- Refurbishment Works to CSSD, The Coombe Hospital.

.- New Two Storey Medical Records Building, NHM, Holles Street.

- New Extension incorporating Triage Dept., NMH, Holles Street.

.- 4 Bed Neo-Natal Intensive Care Unit & FAU, Rotunda Hospital.

- New Two Storey Colposcopy Department, NHM, Holles Street.

- New Phlebotomy Department, The Mater Hospital.

- New Education and Training Centre, The Coombe Hospital.

- Aspergillus Protection Works, Oncology & Theatre, The Mater Hospital

- 1nstallation of CO2 gas services to 12.no Theatres, Mater Hospital.

 

With that, below are a number of notable completed projects in recent years. for news on ongoing projects click here.

Rotunda Hospital - Theatre Extension & LDU Refurbishment 

Project Completed: 2021

The project consisted of the construction of a new four storey extension to The Rotunda Hospital which incorporated a new accounts and emergency department at ground floor level, a new theatre / theatre ancillary areas at levels 1 and 2 and a plant room at level 3. The project also required the refurbishment of the entire labour and delivery unit and the construction of a new MV Switch Room together with a new Energy Centre.

 

Rotunda Hospital - Theatre Extension & LDU Refurbishment - Video

NMH Holles Street - New Theatre Infill Project 

Project Completed: 2021

The project consisted of the construction of a new four storey infill extension to The National Maternity Hospital on a very restricted site which incorporated a shelled out area for a  coffee shop at first floor level, office areas at level 2, a new theatre / theatre ancillary areas at level 3 and  plant room at level 4.

 

Rotunda Hospital - New Neonatal Intensive Care Unit 

Project Completed:2018

The project involved the refurbishment and upgrade of the entire Neo Natal Intensive Care Unit in 3 phases while maintaining the service of the department to the hospital. This involved detailed controls for Aspergillus control, noise and also complex and phased commissioning of the ventilation system to limit the impact on the hospital. The project itself was undertaken within a live acute hospital service. The patients in this department were Immunosuppressed and were vulnerable to Aspergillus. The site was a very controlled area due to the proximity of the patients, Elenfield managed the works and implemented controls to alleviate the risk to these patients.

Lead Designers: O'Connel Mahon Architects, Service Engineers: Arup, Structural Engineers: Arup

 

Coombe Hospital - PPVL Isolation Room - Delivery Suite

Project Completed:2021

This project involved a complete refurbishment and upgrade of an existing delivery suite into a fully compliant PPVL Isolation room in line with infection control efforts for the Hospital.

The intricate design of the newly upgraded facility called for significant Air Handling and Ventilation plant which was facilitated and installed externally before any internal works began. Completing the bulk of the external works before any take over of the area allowed the Hospital use of the room for an extended period in demanding times. The internal works were then carried out on a tight programmed basis to coincide with a short takeover period.

 

The finishing of the facility was cleanroom orientated in order to comply with infection control.

The internal fittings of the facility included a glazed automatic hermetic sliding door, an internal automatic sliding door, a complete en-suite unit and medical grade work stations.

Varming’s were the consulting engineers for this project. PJ Duffy were the Mechanical Contractors and Cloncad were the Electrical Contractors.

 

Elenfield are currently programming the construction of two more PPVL rooms at other locations of the Hospital.

 

Rotunda Hospital - FAU & NICU Refurbishments 

Project Completed:2017

This project required the refurbishment of existing ultrasound scan rooms into a new 6 bed High Risk Neo-Natal Intensive Care Unit which incorporated a new 2 bed isolation cubicle. The project was undertaken adjacent to acute hospital services which included existing NICU Isolation suites. The 2nd phase of the project consisted of the refurbishment of the existing Fetal Assessment Unit to provide an additional 4 no. scan rooms, New Reception and ancillary offices spaces.

Lead Designers: O'Connel Mahon Architects, Service Engineers: Arup, Structural Engineers: Arup

 

Blackrock Clinic - DOSA Project

Project Completed:2017

The newly refurbished DOSA clinic in the Blackrock Clinic was carried out on a tight time frame.

The scope of the works was completed in phases to minimise disruption to acute ongoing hospital services in surrounding area.

The works took place in the vicinity of operating theaters and meant noise and dust was control was of utmost importance. 

The architectural clients on the project were Scott Talon & Walker.

The mechanical contractors were Winthrop. The electrical contrctors were John Cannon Electrical.  

NMH Holles Street - Labor & Delivery Units

Project Completed: 2016

We facilitated a design and build service for the refurbishment works of the existing labor and delivery units, nursery, and semi private rooms at the national maternity hospital, Holles Street.

In line with the majority of the healthcare projects we undertake, this project was completed while maintaining the existing hospital services surrounding the area of works.

The works entailed complete coordination of mechanical and electrical services.

The mechanical contractors were P.J Duffy & Sons and the electrical contractors were Vincent Doherty Limited.

 

CUH Temple Street - New A&E Department

Project Completed: 2015

This project involved the build of a new A&E department and also enabling works for a new OPD department at Temple Street Children's University hospital.

The project was undertaken adjacent to acute hospital services; HDU, ICU, CTHDU ward, & OPD Dept while also maintaining the services of the existing Emergency Department.

The design healthcare architects for these works were O'Connell Mahon. 

Rotunda Hospital - New Mortuary Development

Project Completed: 2015

 

The project involved the complete construction of a new mortuary building in a live hospital environment together with refurbishments to existing areas.

The nature of the new build called for the manufacture of bespoke stainless steel equipment integrated with a sophisticated ventilation systems.

The project entailed complete coordination of mechanical and electrical services and installations.

The design healthcare architects for this project were O'Connell Mahon.  

 

St Michael's Hospital- New Mortuary & Out Patients Department

Project Completed: 2013

Acting as the main contractor and PSCS we delivered brand new build, at the time, state of the art, out patients department and new mortuary development at St Michael's Hospital Dun Laoghaire.

Cullen Payne Architects were the design architects on the project.

 

bottom of page